How to Install a Gatemaster Lock Kit on a Modular Gate | Step-by-Step Installation Guide
Step-by-Step Installation Guide for Installing a Gatemaster Lock
Welcome to our step-by-step guide on how to install a Gatemaster Lock Kit on our modular gate range, including Apollo Mesh Gates, EnviroRail Railing Gates, SpectaRail Gates, and Site Gates. In this tutorial, we’ll cover the installation process for both single-leaf and double-leaf gates, ensuring your gate is secure and functional.
Why Choose the Gatemaster Lock Kit?
- High Security: Prevents unauthorised access with a strong, tamper-resistant design.
- Easy Installation: Simple step-by-step process with common tools.
- Durable & Weatherproof: Built for long-lasting outdoor performance.
- Versatile Compatibility: Works with Apollo Mesh Gates, EnviroRail Railing Gates, SpectaRail Gates, and Site Gates.
Chapters & Step-by-Step Instructions
Installing the Gatemaster Lock on a Single Leaf Gate
00:00 – Introduction to Gatemaster Lock Installation
00:13 – Installing the shroud (optional for added security)
00:22 – Installing the locking plate
00:25 – Attaching the lock assembly to the gate opening
00:33 – Positioning the L-shaped keep on the outside of the gate frame
00:36 – Securing the keep using M8 bolts (size depends on frame thickness)
00:49 – Installing the gate latch:
- Insert through the bottom hole of the keep
- Rotate clockwise to achieve 15mm latch protrusion
- Lock in place with a 3mm long neck Allen key
01:06 – Installing the second part of the keep onto the catch post
01:17 – Securing the keep using M8 bolts
Installing the Gatemaster Lock on a Double Leaf Gate
01:33 – Introduction to double-leaf gate installation
01:36 – Installing the gate shroud (optional for added security)
01:40 – Installing the locking plate
01:43 – Attaching the lock assembly to the gate frame
01:50 – Positioning the L-shaped keep on the outside of the gate frame
01:54 – Securing the keep using M8 bolts
02:07 – Installing the gate latch:
- Insert through the bottom hole of the keep
- Rotate clockwise to achieve 15mm latch protrusion
- Lock in place with a 3mm long neck Allen key
02:28 – Installing the second part of the keep on the other gate leaf
- Ensure both keep plates are opposite each other
- Secure in place with the correct M8 bolts