Welcome to our step-by-step guide on how to install a Gatemaster Lock Kit on our modular gate range, including Apollo Mesh Gates, EnviroRail Railing Gates, SpectaRail Gates, and Site Gates. In this tutorial, we’ll cover the installation process for both single-leaf and double-leaf gates, ensuring your gate is secure and functional.
00:00 – Introduction to Gatemaster Lock Installation
00:13 – Installing the shroud (optional for added security)
00:22 – Installing the locking plate
00:25 – Attaching the lock assembly to the gate opening
00:33 – Positioning the L-shaped keep on the outside of the gate frame
00:36 – Securing the keep using M8 bolts (size depends on frame thickness)
00:49 – Installing the gate latch:
01:06 – Installing the second part of the keep onto the catch post
01:17 – Securing the keep using M8 bolts
01:33 – Introduction to double-leaf gate installation
01:36 – Installing the gate shroud (optional for added security)
01:40 – Installing the locking plate
01:43 – Attaching the lock assembly to the gate frame
01:50 – Positioning the L-shaped keep on the outside of the gate frame
01:54 – Securing the keep using M8 bolts
02:07 – Installing the gate latch:
02:28 – Installing the second part of the keep on the other gate leaf